Hard Clay Grading
Hard clay can demand a preparation step before controlled redistribution. Forcing a deep cut may increase traction demands without producing material suitable for the receiving layer.
Before moving material
Assess dryness, clod formation and service locations.
Receiving operation and checks
Finish the intended layer when material condition permits. Inspect both the cut material and the receiving surface for large void-forming clods.
Rock-like or cemented material may require different equipment.
Read the complete Hard Clay Grading guideDugong Working Weight & Cutting Action
Dugong working weight should be considered in relation to cutting depth, traction and the complete tractor combination. A carried load changes transport and hitch demands as well as the cutting operation.
Before moving material
Confirm current machine weight, permissible loading and tractor limits.
Receiving operation and checks
Recheck handling and receiving-surface condition as loads change. Record the actual configuration used for operating observations.
Weight and blade-pressure estimates are not a substitute for a compatibility assessment.
Read the complete Dugong Working Weight & Cutting Action guideMachine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group