Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

GNSS Machine Control

GNSS machine control combines positioning, machine geometry and design information. An accurate receiver position is not automatically an accurate cutting-edge position.

Before moving material

Confirm corrections, sensor arrangement and the coordinate reference.

Receiving operation and checks

Check the completed surface with an independent method. Inspect offsets, design revision and correction status when results disagree.

Compatibility must be confirmed for the actual machine and control installation.

Read the complete GNSS Machine Control guide

Cut-and-Fill Grading

Cut-and-fill grading pairs a surplus at one location with a deficit at another. A balanced drawing does not necessarily balance truck or scraper loads because soil volumes change with excavation and compaction.

Before moving material

Classify material and identify cut and receiving areas.

Receiving operation and checks

Compact or prepare the placed material for its intended use. Reconcile levels and material quantities during the job.

Do not equate loose bucket capacity with compacted fill volume.

Read the complete Cut-and-Fill Grading guide

Dugong + GPS/GNSS Grading

Using Dugong with GPS/GNSS grading requires a complete positioning and implement-reference workflow. Antenna position must be related to the working edge and the issued surface design.

Before moving material

Confirm corrections, datum and the intended control installation.

Receiving operation and checks

Survey or otherwise independently check the resulting grade. Record interruptions and the design revision used.

A tractor's navigation system alone does not establish scraper grade-control capability.

Read the complete Dugong + GPS/GNSS Grading guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group