Landscape Contouring
Landscape contouring deliberately shapes the land for function and appearance. The profile still needs to connect to drains, access and retained structures.
Before moving material
Identify design contours, finished levels and protected trees or services.
Receiving operation and checks
Place the growing layer and complete planting or hardscape work. Inspect drainage and transitions around the finished contours.
Do not interpret a visual concept as a construction survey.
Read the complete Landscape Contouring guideWater Ponding
Ponding is a symptom, not a design instruction. Filling the wet patch can push water into another area if the outlet or surrounding grade remains wrong.
Before moving material
Record pond extent, duration and outlet condition.
Receiving operation and checks
Correct the confirmed issue and observe the result after suitable rainfall or irrigation. Check water movement beyond the repaired patch.
Persistent wetness may require soil or drainage investigation beyond grading.
Read the complete Water Ponding guideLandscape Rakes
A landscape rake separates or moves surface debris and can assist preparation of a growing surface. It does not provide the same excavation and carrying function as a scraper.
Before moving material
Identify debris type and the layer being prepared.
Receiving operation and checks
Complete growing-medium preparation or planting. Check for remaining debris and unwanted disturbance of the underlying layer.
Do not confuse a clean appearance with a verified grade or soil specification.
Read the complete Landscape Rakes guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group