Drain Construction
Drain construction combines a designed invert with stable sides and a functioning discharge point. A scraper may form accessible shallow sections, while deeper or confined work may need an excavator.
Before moving material
Set out the route and locate utilities and crossings.
Receiving operation and checks
Finish side shaping, stabilisation and crossing details with the appropriate equipment. Survey invert levels at joins and the receiving end.
Depth, stability and discharge requirements can put the task beyond a compact scraper.
Read the complete Drain Construction guidePotholes
A pothole can be a local surface failure or evidence of water and weak support below. The repair method should match its depth and cause.
Before moving material
Inspect the surrounding layer and water entry route.
Receiving operation and checks
Compact the repair and inspect the transition to the existing surface. Check that water is not trapped at the repair edge.
Simply pushing loose soil into a road pothole is not a durable pavement repair.
Read the complete Potholes guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group