Road Formation
Road formation establishes the underlying road shape before base and wearing layers. Correcting it early reduces the chance that later layers must absorb excess thickness variation.
Before moving material
Confirm alignment, grade and the layer sequence.
Receiving operation and checks
Verify and compact before adding the next layer. Check crossfall at intervals and where the alignment changes.
A grader scraper may assist selected sections; larger quantities or long corridors may favour other equipment.
Read the complete Road Formation guideRoad Construction
Road construction requires coordinated longitudinal grade, crossfall, material layers and drainage. Fine shaping should follow an accepted underlying formation rather than conceal its defects.
Before moving material
Set out the road alignment and drainage connections.
Receiving operation and checks
Compact and inspect before placing the next road layer. Check edges, transitions and outlet continuity in addition to centreline levels.
Road design and traffic management are project-specific responsibilities.
Read the complete Road Construction guideSurface Drainage Formation
Surface drainage formation gives runoff a connected route. Forming a depression without checking its outlet can simply relocate the ponding.
Before moving material
Identify catchment entry, the receiving outlet and levels along the route.
Receiving operation and checks
Stabilise the surface and inspect it during a suitable water event. Check continuous drainage through every join and crossing.
A grading pass does not size a drainage system or authorise discharge onto another property.
Read the complete Surface Drainage Formation guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group