Landscape Contractor — Drainage Grading
Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Drainage Formation
Drainage formation is the project stage that connects the planned water route through the earthworks. It should be coordinated with structures and crossings.
Before moving material
Set out the drainage profile and receiving outlet.
Receiving operation and checks
Complete erosion protection and inspect the connected route. Measure critical invert and transition levels.
A surface route does not establish drainage capacity or discharge permission.
Read the complete Drainage Formation guideSurface Drainage Formation
Surface drainage formation gives runoff a connected route. Forming a depression without checking its outlet can simply relocate the ponding.
Before moving material
Identify catchment entry, the receiving outlet and levels along the route.
Receiving operation and checks
Stabilise the surface and inspect it during a suitable water event. Check continuous drainage through every join and crossing.
A grading pass does not size a drainage system or authorise discharge onto another property.
Read the complete Surface Drainage Formation guideLandscape Contouring
Landscape contouring deliberately shapes the land for function and appearance. The profile still needs to connect to drains, access and retained structures.
Before moving material
Identify design contours, finished levels and protected trees or services.
Receiving operation and checks
Place the growing layer and complete planting or hardscape work. Inspect drainage and transitions around the finished contours.
Do not interpret a visual concept as a construction survey.
Read the complete Landscape Contouring guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group