Road Construction

Road construction requires coordinated longitudinal grade, crossfall, material layers and drainage. Fine shaping should follow an accepted underlying formation rather than conceal its defects.

Before moving material

Set out the road alignment and drainage connections.

Receiving operation and checks

Compact and inspect before placing the next road layer. Check edges, transitions and outlet continuity in addition to centreline levels.

Road design and traffic management are project-specific responsibilities.

Read the complete Road Construction guide

Civil Construction

Civil construction grading sits within a design, material and inspection sequence. The useful question is which layer is being handed to which contractor, not whether the site merely looks level.

Before moving material

Confirm approved drawings, services and inspection hold points.

Receiving operation and checks

Verify the completed layer before the next trade covers it. Record levels, material records and unresolved defects together.

Dugong may suit controlled redistribution; deep excavation and engineered fill acceptance need their own methods.

Read the complete Civil Construction guide

Surface Drainage Formation

Surface drainage formation gives runoff a connected route. Forming a depression without checking its outlet can simply relocate the ponding.

Before moving material

Identify catchment entry, the receiving outlet and levels along the route.

Receiving operation and checks

Stabilise the surface and inspect it during a suitable water event. Check continuous drainage through every join and crossing.

A grading pass does not size a drainage system or authorise discharge onto another property.

Read the complete Surface Drainage Formation guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group