Landscape Surface Handover
A landscape-surface handover connects soil levels with the intended paths, planting and drainage. The growing layer and structural features need their own acceptance checks.
Before moving material
Confirm finished levels and the planting-medium requirements.
Receiving operation and checks
Hand over to the planting or hardscape team with remaining work identified. Inspect thresholds, tree zones and drainage transitions.
A visual landscape concept is not an issued construction design.
Read the complete Landscape Surface Handover guideSports Turf Surface Handover
A sports-turf handover should identify the formation, drainage and growing-layer system delivered. Playing-surface appearance alone does not establish venue acceptance.
Before moving material
Obtain the applicable project and sport requirements.
Receiving operation and checks
Complete the venue's inspection and release process. Retain measured levels and relevant construction records.
No sport or venue compliance is claimed from illustration or grading alone.
Read the complete Sports Turf Surface Handover guideTurf Production
A turf production field needs a growing surface that supports mowing, irrigation and harvesting. Small irregularities can affect repeated machine passes, but unnecessary deep cuts can remove the valuable growing layer.
Before moving material
Record the existing turf system, topsoil depth and irrigation arrangement.
Receiving operation and checks
Prepare the final seedbed and establish turf using the farm's normal process. Check the surface under the expected irrigation and traffic conditions.
A scraper does not establish the agronomic specification of the growing medium.
Read the complete Turf Production guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group