Surface Drainage Formation
Surface drainage formation gives runoff a connected route. Forming a depression without checking its outlet can simply relocate the ponding.
Before moving material
Identify catchment entry, the receiving outlet and levels along the route.
Receiving operation and checks
Stabilise the surface and inspect it during a suitable water event. Check continuous drainage through every join and crossing.
A grading pass does not size a drainage system or authorise discharge onto another property.
Read the complete Surface Drainage Formation guideUneven Turf Formation
Uneven turf formation may arise beneath the growing layer or within it. Repeatedly topdressing the visible depression may leave the formation issue unresolved.
Before moving material
Locate the uneven area and identify the turf system's layer arrangement.
Receiving operation and checks
Restore the specified growing surface and turf. Check local levels, layer depth and drainage after the repair.
The correct treatment depends on the turf system and cannot be inferred from a photograph.
Read the complete Uneven Turf Formation guideDrainage Formation
Drainage formation is the project stage that connects the planned water route through the earthworks. It should be coordinated with structures and crossings.
Before moving material
Set out the drainage profile and receiving outlet.
Receiving operation and checks
Complete erosion protection and inspect the connected route. Measure critical invert and transition levels.
A surface route does not establish drainage capacity or discharge permission.
Read the complete Drainage Formation guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group