Surface Tolerance Explained
Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Building Pad Surface Handover
A building-pad handover must identify the formation, level reference and evidence for the intended foundation work. Geometry and material suitability are separate acceptance questions.
Before moving material
Obtain the structural and civil requirements for the pad.
Receiving operation and checks
Provide the builder with accepted level and material records. Check thresholds and surrounding runoff as well as the pad surface.
This guide does not establish bearing capacity or certify engineered fill.
Read the complete Building Pad Surface Handover guideRoad Surface Handover
A road-surface handover should identify the layer being accepted and the next paving or traffic operation. A base-layer check and a wearing-surface check are not interchangeable.
Before moving material
Confirm layer specification, alignment and receiving operation.
Receiving operation and checks
Release the accepted layer to surfacing or the intended use. Check edges, junctions and drainage connections.
The design sets applicable tolerances; the machine brand does not.
Read the complete Road Surface Handover guideLandscape Surface Handover
A landscape-surface handover connects soil levels with the intended paths, planting and drainage. The growing layer and structural features need their own acceptance checks.
Before moving material
Confirm finished levels and the planting-medium requirements.
Receiving operation and checks
Hand over to the planting or hardscape team with remaining work identified. Inspect thresholds, tree zones and drainage transitions.
A visual landscape concept is not an issued construction design.
Read the complete Landscape Surface Handover guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.