Project reference 00252

What Is Rough Grade?

Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

From Rough Grade to Fine Grade

Rough grading establishes the broad shape; fine grading corrects the remaining smaller deviations. Trying to finish while bulk quantities are still wrong can waste passes and disturb completed areas. The changeover should occur when levels are close enough, materials are suitable and the receiving surface is ready for controlled trimming.

Before moving material

Complete major excavation and isolate unsuitable ground.

Receiving operation and checks

Protect the finished area from uncontrolled traffic and schedule the next layer. Check local levels and continuity through joins, not only the average elevation.

Fine grading cannot rescue a weak formation hidden beneath a neat finish.

Read the complete From Rough Grade to Fine Grade guide

Rough Grading Correction

Rough-grade correction starts by deciding whether the mismatch is local or distributed across the whole area. A local touch-up is efficient only when the larger formation is already sound.

Before moving material

Survey enough of the area to locate the extent of error.

Receiving operation and checks

Remeasure corrected areas against unchanged reference points. Check that the repair has not moved the error into an adjacent zone.

A repeated failure may require a revised design or foundation repair.

Read the complete Rough Grading Correction guide

Cut, Collect, Carry, Place & Grade

Dugong's cut, collect, carry, place and grade sequence should be planned around the job's actual material route. Filling a bowl is not the end of the task; placing material correctly and checking the surface are part of the cycle.

Before moving material

Mark source and receiving areas and confirm tractor suitability.

Receiving operation and checks

Prepare and verify the receiving layer. Include empty return and turning time when estimating the cycle.

The workflow does not promise a universal hourly production rate.

Read the complete Cut, Collect, Carry, Place & Grade guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry