Subgrade Before Pavement

Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Subgrade Preparation

Subgrade preparation creates the surface that supports the next pavement or structural layer. The visible level and the condition of the material both matter.

Before moving material

Remove unsuitable material according to the project instructions and establish the formation reference.

Receiving operation and checks

Prepare for the specified compaction and acceptance process. Check levels, moisture and soft areas before the next layer is placed.

A geometric check cannot replace material testing.

Read the complete Subgrade Preparation guide

Uneven Subgrade

Uneven subgrade can create variable thickness in every layer above it. Correcting the surface is useful only if the underlying support is acceptable.

Before moving material

Identify soft areas and compare formation levels with design.

Receiving operation and checks

Complete compaction and specified acceptance checks. Check levels before base material conceals the subgrade.

A scraper does not replace proof testing or project-specific investigation.

Read the complete Uneven Subgrade guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.