Grading After Loader Work
Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.
This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.
Machine Before - Dugong - Machine After
The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.
Before moving material
Identify the upstream operation and its remaining defects.
Receiving operation and checks
Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.
The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.
Read the complete Machine Before - Dugong - Machine After guideLoader to Grading Workflow
A loader handles stockpiles and delivers material; the next grading operation distributes that material into the required surface. Avoid treating irregular loader deposits as a finished layer.
Before moving material
Confirm material class and the receiving layer's requirements.
Receiving operation and checks
Compact or prepare the layer for its next use. Check the depth and consistency between deposited loads.
Scraper loading and loader bucket handling are different capabilities.
Read the complete Loader to Grading Workflow guideHow to Grade Before Asphalt
Grading before asphalt should establish the correct supporting profile and allow for the specified surfacing thickness. Resolve drainage and transition errors before paving.
Before moving material
Confirm the supporting-layer acceptance and finished elevations.
Receiving operation and checks
Hand over to the asphalt contractor with level and acceptance records. Check joints, gutters and connections to existing pavement.
Asphalt placement should not be presented as a function of the scraper.
Read the complete How to Grade Before Asphalt guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group