What Happens After Excavation?

Describe the application, material route, growing or working area and proposed rental period. A listed scenario is not a claim that a Dugong rental unit or local service is available.

This reference assembles relevant extracts from the guide library. It is general project planning, not a local project report, verified specification or translated technical publication.

Machine Before - Dugong - Machine After

The machine before Dugong determines what material arrives; the machine after Dugong determines what surface must leave. An excavator can expose formation, a loader can deliver a stockpile, and a roller can compact the placed layer. The scraper's role is bounded by those interfaces.

Before moving material

Identify the upstream operation and its remaining defects.

Receiving operation and checks

Hand over the measured surface to compaction, cultivation, paving or turf preparation. Record which operation owns levels, materials and final acceptance.

The workflow can include Dugong where suitable; it does not assume Dugong replaces adjacent equipment.

Read the complete Machine Before - Dugong - Machine After guide

Bulk Excavation

Bulk excavation removes major quantities or unsuitable material before the surface-finishing stage. Plan where the excavated material goes before the work blocks later access.

Before moving material

Confirm excavation limits, services and material handling requirements.

Receiving operation and checks

Inspect exposed formation before controlled redistribution or fill placement. Compare excavation limits and remaining formation with the design.

Deep excavation and stability questions need their appropriate specialist methods.

Read the complete Bulk Excavation guide

How to Grade Before Asphalt

Grading before asphalt should establish the correct supporting profile and allow for the specified surfacing thickness. Resolve drainage and transition errors before paving.

Before moving material

Confirm the supporting-layer acceptance and finished elevations.

Receiving operation and checks

Hand over to the asphalt contractor with level and acceptance records. Check joints, gutters and connections to existing pavement.

Asphalt placement should not be presented as a function of the scraper.

Read the complete How to Grade Before Asphalt guide

Record the job inputs

Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.

Checklist ticks apply only while this page is open. Include the completed brief in your project records.

Prepare a project enquiry

Continue through the network

Surface and verification · Applications and rental · Equipment and technology

Return to this reference group