Pre-Hot-Mix Grading
Pre-hot-mix grading prepares the layer beneath asphalt. Asphalt should not be expected to cure broad formation errors or drainage reversals.
Before moving material
Confirm the accepted layer, finished road profile and surfacing allowance.
Receiving operation and checks
Complete compaction and inspection before asphalt placement. Check transitions at joints, gutters and existing pavement.
Dugong can help prepare suitable ground; it is not an asphalt paver or compactor.
Read the complete Pre-Hot-Mix Grading guidePre-Paving Grading
Pre-paving grading sets the profile below the finished paving system. Its target must allow for the planned bedding and paving thickness rather than equal the finished top level.
Before moving material
Confirm thresholds, finished surface levels and layer thicknesses.
Receiving operation and checks
Complete compaction and place the specified bedding and paving system. Check the difference between formation level and finished level.
Paving details and tolerances must come from the project specification.
Read the complete Pre-Paving Grading guideLand Levelling
Land levelling changes the relationship between high and low areas. It need not mean a horizontal surface: many uses require a deliberate fall. Define that finished relationship before deciding where soil should move.
Before moving material
Survey the site and protect a usable elevation reference.
Receiving operation and checks
Make controlled finishing passes and remeasure before the next operation. Check the designed fall as well as local smoothness.
Removing every visible high spot without a plan can create a new drainage problem.
Read the complete Land Levelling guideRecord the job inputs
Use this checklist to turn the scenario into a specific brief. Retain the design revision and agree who accepts each completed layer.
Checklist ticks apply only while this page is open. Include the completed brief in your project records.
Prepare a project enquiryContinue through the network
Surface and verification · Applications and rental · Equipment and technology
Return to this reference group